초고층 주거복합 건물의 통합 설계관리 효과분석
- Alternative Title
- Integrated Design Management of Residential High-rise Building
- Abstract
- The field of Design Management in prior to construction is just recently introduced to the part of design process and there is a lack of a united and concrete standard of work scope. This field also needs development and research progresses about the achievement techniques.
In case of the Integrated Design Management, there are not many design related parties (owner, construction manager, architect, special service company and contractor) integrated in the process. Therefore, many development opportunities are available to concrete operation process and accomplishment model.
This research is about the accomplishment model based on records and experiences of the Integrated Design Management, which was applied to high rise multi-purpose residential buildings over 45 floors with the examples of Adelis (47 floors), Centum Star (60floors)and CentralStar(58floors) in Busan built since 2007. This research attempts to modify the method that becomes adaptable to each individual project case. Also the aim of this research is to recognize the necessity of an integrated design from the studies of high-rise multifunctional architecture cases. This can be a reference material, which meets diverse demands of planning future multifunctional residential high-rises building.
- Author(s)
- 정찬엽
- Issued Date
- 2010
- Awarded Date
- 2010. 2
- Type
- Dissertation
- Keyword
- 초고층 주거복합 통합 설계관리
- Publisher
- 부경대학교
- URI
- https://repository.pknu.ac.kr:8443/handle/2021.oak/10215
http://pknu.dcollection.net/jsp/common/DcLoOrgPer.jsp?sItemId=000001955984
- Alternative Author(s)
- Jung, Chan-Yop
- Affiliation
- 부경대학교 대학원 건설관리공학협동과정
- Department
- 대학원 건설관리공학협동과정
- Advisor
- 김수용
- Table Of Contents
- 제1장 서 론
1.1 연구 배경 및 목적 1
1.2 연구 범위 및 방법 4
제2장 설계관리에 관한 예비적 고찰
2.1 개요 6
2.2 초고층 주거복합 건물 설계관리와 문제점 6
2.3 설계 단계별 추진업무 8
제3장 통합설계관리 방법
3.1 개요 10
3.2 통합설계 운영목적 10
3.3 통합설계 업무분장 11
3.4 설계사 선정과 설계 성과품 관리 12
3.5 통합설계관리 조직구성과 기간 15
3.6 Fast Track 에 의한 통합설계관리 24
3.7 통합설계 설계도서의 품질 및 성과관리 35
3.8 통합설계 회의 43
3.9 기술검토 및 VE추진 44
제4장 통합설계 운영성과
4.1 통합설계 운영성과 47
4.2 부문별 통합설계 주요성과 사례 48
제5장 결 론 62
참고문헌 63
- Degree
- Master
-
Appears in Collections:
- 대학원 > 건설관리공학협동과정
- Authorize & License
-
- Files in This Item:
-
Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.