PUKYONG

Subcontractor Selecting with DEA and AHP Model in Vietnamese Construction Projects

Metadata Downloads
Abstract
In the construction of most projects, a significant role is played by specialty contractors, also common referred to as subcontractors. Deciding whether to invite subcontractors or not and how to select the best subcontractor on a project is regarded as one of the big challenges faced by general contractors. The decision – marking problem involves the consideration of several factors such as the difficulty of items, ability of the main contractors or the market and so on. Although several researchers have targeted the subject of bidding in construction, none of them has tackled the subcontractor bid invitation/no invitation problem in particular. The purpose of this study is to propose an empirical framework for making the subcontractor bid invitation/ no invitation decision and model for selecting the best subcontractor. The proposed model consists of four consecutive components. Component 1 determines key factors that are considered by main contractors when evaluating items. Project engineer, project managers, contract managers at contracting organizations including general contractors and subcontractors were interviewed to identify factors that affect the bid invitation/no invitation decision. Component 2 suggests data envelopment analysis (DEA) model to make the bid invitation/no invitation decision. Component 3 identify the factors influencing the subcontractor selecting. Lastly, component 4 suggests the AHP model for subcontractor selection.
Author(s)
NGUYEN TUAN KIET
Issued Date
2016
Awarded Date
2016. 2
Type
Dissertation
Publisher
Pukyong National University, Interdisciplinary Program of Construction Engineering and Management
URI
https://repository.pknu.ac.kr:8443/handle/2021.oak/12906
http://pknu.dcollection.net/jsp/common/DcLoOrgPer.jsp?sItemId=000002229255
Affiliation
Pukyong National University, Interdisciplinary Program of Construction Engineering and Management
Department
대학원 건설관리공학협동과정
Advisor
Professor Soo Yong Kim
Table Of Contents
TABLE OF CONTENTS
ABSTRACT i
ACKNOWLEDGEMENTS ii
TABLE OF CONTENTS iv
LIST OF TABLES vii
LIST OF FIGURES ix
ABBREVIATIONS xi
CHAPTER 1 INTRODUCTION
1.1 Background and objectives 1
1.2 Scope of research and methodologies 3
CHAPTER 2 LITERATURE REVIEW
2.1 Bid decision 6
2.2 Contractor-subcontractor relationship 8
2.3 Subcontractor selection 11
2.4 Factor review for identifying factor affecting the subcontractor invitation decision 18
2.5 Factor review for identifying factor affecting the subcontractor selection 20
2.6 Chapter conclusions 22
CHAPTER 3 FACTORS AFFECTING THE SUBCONTRACTOR INVITATION DECISION
3.1 Introduction 23
3.2 Identifying factors affecting the invitation decision 29
3.3 Descriptive analysis 32
3.4 Factor analysis 48
3.5 Chapter conclusions 62
CHAPTER 4 DEA MODEL FOR MAKING THE SUBCONTRACTOR INVITATION DECISION
4.1 Introduction 63
4.2 Proposing the model 65
4.3 Applying the model 67
4.4 Chapter conclusions 69
CHAPTER 5 FACTORS AFFECTING SUBCONTRACTOR SELECTION
5.1 Introduction 71
5.2 Questionnaire 72
5.3 Data collection 73
5.4 Data analysis 74
5.5 Factor analysis 83
5.6 Chapter conclusions 93
CHAPTER 6 AHP MODEL FOR SUBCONTRACTOR SELECTION
6.1 Introduction 95
6.2 Analytical Hierarchy Process 96
6.3 Solution Stages of AHP Problems 96
6.4 Questionnaire 100
6.5 Data collection 103
6.6 The Analytic Hierarchy Process model 106
6.7 Proposing the indicator for AHP model to select the subcontractor 109
6.8 Discussions 114
6.9 Chapter conclusions 114
CHAPTER 7 CONCLUSIONS 116
REFERENCES 119
APPENDIX
Appendix 1 Questionnaire: factors affecting subcontractor invitation decision 126
Appendix 2 Questionnaire: factors influencing the selection of subcontractors 130
Appendix 3 Questionnaire: factors influencing the selection of subcontractors 134
Degree
Doctor
Appears in Collections:
대학원 > 건설관리공학협동과정
Authorize & License
  • Authorize공개
Files in This Item:

Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.