감리와 건설사업관리 통합에 따른 감리원의 역량강화 방안
- Alternative Title
- Plans on Supervisors Strengthening of Ability in Accordance with Integration of Construction
- Abstract
- In accordance with the requirements of competitiveness improvement for construction technology service business in global construction markets, and necessity for switching from its paradigm based on regulation and management to promotions or supports, Ministry of Land, Infrastructure and Transport (MOLIT) proclaimed the general revision of 'Construction Technology Management Act' in May, 2013. In light of the fact that the revision contains an integration policy aiming at the unification into the construction management, which was formerly being operated in dualized system by design/supervision and construction management (CM), it is expected that the construction technology service market will begin facing great changes from now on.
Therefore, this research suggests plans on strengthening of ability for supervisors' smooth CM task performance under the environmental changes coming from the integration of construction technology service business.
This research paper was made as follows:
1) It grasped the concepts and the current status of materials for plans on strengthening of ability, which went through studies of supervision and CM related regulations, reference researches, and market condition examinations of construction service business.
2) With comparison analyses of supervisions and CM services, it deducted problems incurred during the current supervisors' performance of CM services.
3) It deducted plans on strengthening of ability by working out requirements of the current supervisors' strengthening of CM services ability, importance in CM services, through questionnaires.
4) It suggested the ability-strengthening plans in terms of supervision companies, individual supervisors, and CM-specialized educations.
Based on the details derived from the questionnaires, this research proposed main contents for plans on strengthening of CM services ability in the following manner:
1) Abilities on technical support must be intensified by readjusting CM organization system in terms of supervision companies, building information system, and securing CM-related technicians.
2) Abilities should be strengthened by the supervisors' changes of their mind to construction management, expansions of business area, and possessions of element technical skills.
3) The abilities must be strengthened for phases such as pre-design stage, design stage, business plan & plan management, working expenses management, design management, and ten sections on detailed important task, which were examined through the construction management business' importance research.
5) The current supervisors' abilities can be improved by revitalizing CM-specialized educations and integrating qualifications management.
I hope that the plans on strengthening of ability suggested in this research can be useful for supervisors who are about to start their CM services to improve themselves to meet the level of CMr. Also, it is considered that they should keep making their greater efforts to become CM professionals with securing various skills and management capabilities under the rapidly changing construction environment.
Key words: construction management (CM), supervisions, Construction Technology Management Act, ability-strengthening plans
- Author(s)
- 마진혁
- Issued Date
- 2014
- Awarded Date
- 2014. 2
- Type
- Dissertation
- Publisher
- 부경대학교
- URI
- https://repository.pknu.ac.kr:8443/handle/2021.oak/1440
http://pknu.dcollection.net/jsp/common/DcLoOrgPer.jsp?sItemId=000001966849
- Affiliation
- 대학원
- Department
- 대학원 건설관리공학협동과정
- Advisor
- 김수용
- Table Of Contents
- 표 목 차 ⅰ
그림 목차 ⅲ
Abstract ⅳ
국문요약 ⅶ
제1장 서 론
1.1 연구의 배경 및 목적 1
1.2 연구의 범위 및 방법 3
제2장 이론적 고찰 및 관련 문헌연구
2.1 감리제도 5
2.1.1 감리의 정의 5
2.1.2 감리제도의 법령에 따른 분류 6
2.1.3 감리제도의 연혁 7
2.1.4 감리시장 현황 9
2.2 건설사업관리(CM) 10
2.2.1 CM의 정의 10
2.2.2 CM도입 배경 및 필요성 13
2.2.3 CM계약 유형 14
2.2.4 CM시장 현황 16
2.3 관련 문헌 연구 19
제3장 감리원의 CM업무 수행 시 문제점 분석
3.1 감리 및 CM업무 분석 22
3.1.1 책임감리 업무내용 분석 22
3.1.2 CM업무내용 분석 23
3.1.3 감리와 CM업무 비교 분석 27
3.2 현행 감리원의 CM업무 수행 시 문제점 31
3.2.1 업무 범위의 한계성 31
3.2.2 프로젝트 운영 관리적 미비 32
3.2.3 기술력 확보 미비 33
3.2.4 CM전문 교육 미비 34
3.2.5 CM업무 마인드 부재 35
제4장 CM업무 수행을 위한 업무역량 강화 방안
4.1 설문조사 36
4.1.1 설문조사 개요 36
4.1.2 설문조사 결과 분석 38
4.1.3 설문조사 종합 분석 50
4.1.4 설문조사를 통한 시사점 51
4.2 감리회사 차원의 역량강화 방안 52
4.2.1 CM조직체계 정비 52
4.2.2 지식 정보화 SYSTEM 체계구축 54
4.2.3 CM관련 기술자 확보 및 기술지원 60
4.3 감리원의 CM업무 역량 강화 방안 62
4.3.1 감리에서 건설사업관리(CM) 마인드 전환 62
4.3.2 건설사업관리의 업무영역 확대 63
4.3.3 건설사업관리의 요소 기술력 확보 66
4.4 CM업무 중요도 분석에 따른 역량강화 73
4.5 감리원의 CM전문교육 활성화 방안 74
제5장 결 론 75
참고문헌 76
- Degree
- Master
-
Appears in Collections:
- 대학원 > 건설관리공학협동과정
- Authorize & License
-
- Files in This Item:
-
Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.