By 2010, the order of overseas construction was emerging as one of a key factor driving domestic economy by reaching 70 billion dollars which it excessed a maximum amount of yearly order. In recent 6 years, domestic companies have been taking huge success in the period of the boom in overseas construction. In accordance with analyzing this success, the plant industry had been getting increased which it was taking part of 80% of the order of overseas construction.
In location, the middle Asia would be expected as the area indicated a increasing trend which it was taking part of 70%. Also, the order scope of overseas plant industry in the year of 2015 would be expected to reach the amount of 1,110 billon dollars, and the market would be divided the field of an energy usage and a water treatment. The middle Asia and the area of Pacific Ocean would be expected to be the area leading mainly the overseas plant industry.
It is expected that the amount of the order of overseas plant industry would reach 90billion ~ 100billon dollars by 2015, which this industry would be taking a role as one of core driving a future domestic economy.
However, a status of participant in the plant market has been changed, and the uncertainty has been increased as the trend of plant market has been changed to EPC project complying with BOT as a full turn-key not as a separated order leaded by the government. Also, the importance of the engineering and the capacity of manufacturing key facilities have been increasing by the scale-up and the quality enhancement of the plant industry. Due to this trend diversity, the project risk has been sharply increasing which it effected in negative way to the project achievement of domestic plant company not good at the risk treatment compared to other nations as a low profit yield and a high failure rate.
Therefore, this research is mainly focusing on a benchmarking of advanced risk management system of foreign companies and its application to risk decreasing for domestic plant companies.
Following is the summary that the study draws as conclusion:
- The strategy of risk management and the process improvement were suggested which it was including the risk manage improvement by the gain of key source and key capacity and the process improvement of risk management by the enhancement of ERM.
- The need of the division for the project management being suitable of EPC project and the establishment of a circumstance and a system for the active working of the manager division for project engineering and the operation of a council committee for the communication enhancement and the increase of the capacity for risk management were suggested in this research.
- The need of the improvement about the system to bring up the project manager was suggested.
In this research, the strategy of efficient risk management for the domestic plant companies in overseas plant market was presented. In the future, the research in this field would be extended and deepened in two ways as summarized as following:
- It would be the development of risk manage process in attach with the working process as the establishment of total solution for the risk due to the circumstance prior to as the separate solution in after.
- It would be the sustainable R&D of a strategy and a equipment for the risk management. This research makes some efforts to be helping for domestic plant companies to the gain of sustainable profit by the stable accomplishment of the project as the establishment of the risk management system being capable of getting over an unavoidable risk.
- Author(s)
- 박윤식
- Issued Date
- 2012
- Awarded Date
- 2012. 2
- Type
- Dissertation
- Publisher
- 부경대학교
- URI
- https://repository.pknu.ac.kr:8443/handle/2021.oak/9208
http://pknu.dcollection.net/jsp/common/DcLoOrgPer.jsp?sItemId=000001965646
- Department
- 대학원 시스템경영공학과
- Advisor
- 박병무
- Table Of Contents
- 제1장 서론 1
제1절 연구 배경 및 목적 1
제2절 연구 범위 및 논문 구성 2
제2장 해외플랜트산업의현황및전망 3
제1절 해외 건설 수주 현황 3
제2절 플랜트 수주 전망 6
제3장 플랜트산업과리스크관리의이론 9
제1절 플랜트 산업의 정의 9
제2절 플랜트 산업의 특성 10
제3절 리스크 관리의 이론 12
제4장 해외플랜트산업의환경변화와그영향 19
제1절 해외 플랜트 산업의 환경 변화 19
제2절 환경 변화에 따른 영향 22
제5장 선진사리스크관리의현황과사례벤치마킹 31
제1절 선진사의 리스크 관리 현황 31
제2절 선진사 리스크 관리 사례 벤치마킹 32
제6장 리스크관리개선방안 37
제1절 리스크 관리 전략 및 프로세스 개선 37
제2절 리스크 관리 조직 및 환경 개선 39
제3절 인력 육성 체계 개선 42
제7장 요약및결론 44
[참고 문헌] 46
[Abstract] 48
- Degree
- Master
-
Appears in Collections:
- 대학원 > 시스템경영공학과
- Authorize & License
-
- Files in This Item:
-
Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.