건설프로젝트 시공단계 참여자간의 갈등발생 요인에 관한 연구
- Alternative Title
- Study on the Conflicting Factors among the Construction Project Participants
- Abstract
- Several organizations join their efforts to perform the construction project from the planning stage to the completion stage during The participatory organization and each individual in project do work with mutually different interests and goals. Thus, a conflict happens.
This study elicited recognition, occurrence frequency, and serious level on a conflict, which is suffered among construction-work participants at the construction stage of the construction project, on the basis of documentary research, and analyzed by using questionnaire survey and statistical technique.
As a result, the causes for conflict to which all of participants agree were indicated to be 9 elements such as the local residents' civil appeal, the influence of a delay in decision-making upon construction stage, the prior meeting of construction participants at the initial construction stage, the difference in construction quantities, the unexpected field condition, the excessive communication of documents among ordering body·supervisor·builder·designer, the insufficiency of communication among construction participants, the ambiguity in the provisions of specifications, the safety management and disaster occurrence during the progress of construction work.
It was indicated that the ordering body is thinking it to be small about the occurrence frequency and seriousness of conflict, but that builder is thinking occurrence frequency and seriousness to be relatively bigger.
As a result of factor analysis, 8 factors were indicated such as the lack of communication, the lack of prior preparation, the defect of a design, the construction management in the ordering body, the excessive field task, engineer's decision ability, the field characteristic in project, and the lack of the field knowledge. The lack of prior preparation and the field characteristic in project were indicated to be conflict factors that are recognized in common by all participants.
- Author(s)
- 이승강
- Issued Date
- 2011
- Awarded Date
- 2011. 8
- Type
- Dissertation
- Keyword
- Construction-Work Participants Conflict Agreement
- Publisher
- 부경대학교
- URI
- https://repository.pknu.ac.kr:8443/handle/2021.oak/9307
http://pknu.dcollection.net/jsp/common/DcLoOrgPer.jsp?sItemId=000001965363
- Alternative Author(s)
- Lee, Seung Gang
- Affiliation
- 건설관리공학협동과정
- Department
- 대학원 건설관리공학협동과정
- Advisor
- 이영대
- Table Of Contents
- 표 목차 ⅲ
그림 목차 ⅴ
Abstract ⅵ
1. 서 론
1.1 연구의 배경 1
1.2 연구의 목적 2
1.3 연구범위 및 방법 2
2. 문헌연구
2.1 이론적 고찰 3
2.1.1 갈등 정의 3
2.1.2 갈등 진행 5
2.1.3 갈등 원인 7
2.1.4 갈등 관리 9
2.2 시공단계 갈등 10
2.2.1 국내 연구사례 10
2.2.2 국외 연구사례 11
3. 실증적 연구
3.1 연구방법 13
3.1.1 연구절차 13
3.1.2 자료해석 14
3.1.3 적합성 분석 21
3.2 설문조사 23
3.2.1 설문방법 23
3.2.2 갈등원인 조사 23
4. 연구결과
4.1 응답자 정보 26
4.2 건설갈등 요소 29
4.2.1 신뢰도 분석 Cronbach alpha(α) 29
4.2.2 전체 참여자의 동의 29
4.2.3 참여자별 갈등요소 32
4.3 갈등 발생빈도 및 심각성 34
4.4 요인분석 39
4.4.1 참여자별 요인분석 39
4.4.2 참여자별 요인분석 결과 47
5. 결론
참 고 문 헌 53
부 록 54
- Degree
- Master
-
Appears in Collections:
- 대학원 > 건설관리공학협동과정
- Authorize & License
-
- Files in This Item:
-
Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.