The VE (Value Engineering) of a construction project is largely classified into the design VE and the construction VE. The earlier the VE starting point is, the better the effect is. Therefore, applying the VE at the designing stage is much more effective than the constructing stage to reduce construction cost and to raise the quality of a product. The VE should keep pace with a designing process. However, due to a lack of time, it is difficult to get a reliable effect of a VE application. It is vital to stimulate the construction VE to complement with the legislated design VE.
The construction VE in Korea had been partly applied by private enterprises, but it has come into wide use since the design VE defined by the Law of Construction Technique Management.
Revising locally performed VE examples for the last decade, those examples are all fragmentary introductions. Accommodating studies are mostly caused by the time limitation of VE activity, the lack of practical information, and the shortage of experts. Therefore, in-depth studies are hardly found in the category.
The research from the point of view of literature, management, and system was possible to find the main reason of a construction VE’s inactivation problem. The reason is that the existing construction VE process could not reflect practical quality.
Therefore, this study improves a process of the construction VE based on practice. The keys pillars of advanced construction VE process are an examination of interference of each step, a choice of the VE target based on a risk analysis, and an evaluation method using GFI.
To illustrate an applicability of the improved process, the case study used the method to the sample project. The result of an improved VE process applicability shows better specification compared to the existing VE process, such as application procedure, application method, and connection to other tasks. Since the revised process reflects the characteristics of the construction VE executed in the field of value engineering, it is helpful for VE members to approach substantially.
Author(s)
이영록
Issued Date
2011
Awarded Date
2011. 2
Type
Dissertation
Publisher
부경대학교
URI
https://repository.pknu.ac.kr:8443/handle/2021.oak/9758
http://pknu.dcollection.net/jsp/common/DcLoOrgPer.jsp?sItemId=000001964015
Alternative Author(s)
Lee Young Rock
Department
대학원 건설관리공학협동과정
Advisor
김수용
Table Of Contents
목 차


표 목차 ⅵ
그림 목차 ⅶ
Abstract ⅷ


제1장 서 론
1.1 연구 배경 및 목적 1
1.2 연구 범위 및 방법 2

제2장 이론적 고찰
2.1 VE의 기본 원칙 3
2.2 설계VE와 시공VE 8
2.3 시공VE 필요성과 기대효과 11
2.4 시공VE 적용대상 13
2.5 현행 시공VE 문제점 15

제3장 시공VE Process 개선
3.1 시공VE 개선 Process 20
3.2 시공VE Process별 적용방법 22

제4장 개선 Process의 적용
4.1 사례 프로젝트 개요 32
4.2 적용 결과 34
4.3 결과의 고찰 48

제5장 결 론

참고문헌 50

부 록 52
Degree
Master
Appears in Collections:
대학원 > 건설관리공학협동과정
Authorize & License
  • Authorize공개
Files in This Item:

Items in Repository are protected by copyright, with all rights reserved, unless otherwise indicated.